Now delivering across Egypt, MENA, and the Gulf. Speak to our team →

Projects/Software & Technology/Full HQ Renovation for Bashar Soft — Ground and Basement Floors
Software & TechnologyFacility Technology & Managed ServicesLow-Current & Security SystemsICT InfrastructurePower & Energy

Full HQ Renovation for Bashar Soft — Ground and Basement Floors

Client: Bashar Soft

End-to-end renovation of Bashar Soft's headquarters across ground and basement floors, integrating electrical, low-current, ICT, and facility scopes under a single delivery.

Context

Bashar Soft, a growing technology company, required a comprehensive renovation of its headquarters facility covering the ground and basement floors. The project demanded coordinated delivery across multiple disciplines — electrical, ICT, low-current, and facility — within an active operational environment.

Challenge

  1. 1Coordinate electrical, structured cabling, low-current, and facility scopes within a single schedule.
  2. 2Deliver multi-floor renovation with minimal disruption to ongoing operations.
  3. 3Achieve a finished workspace that supports modern technology workflows and meeting collaboration.
  4. 4Produce comprehensive handover documentation for ongoing operations.

Solution

Scope

Comprehensive renovation of ground and basement floors including electrical distribution, structured cabling, low-current systems, workspace configuration, and final facility commissioning. Single-source design-build delivery.

Technologies

  • Structured cabling backbone (Cat6A copper, OS2 fiber)
  • Enterprise network switching and wireless
  • Access control and low-current security
  • Electrical distribution and lighting
  • Audiovisual and collaboration systems for meeting spaces

Engagement model

Single-source design-build with weekly client status reporting.

Duration

Approximately 4–6 months from kickoff to handover.

Outcome

Quantitative results

  • Full multi-floor renovation delivered on schedule.
  • Integrated handover with consolidated documentation.
  • Ongoing facility maintenance arrangement post-completion.

Qualitative

Bashar Soft received a modernized headquarters environment with documented infrastructure, ready for technology-team workflows and ongoing scale.

Artifacts available on request

  • Project BoQ
  • Single-line electrical diagrams
  • As-built drawings
  • Acceptance certificates

Nash shares engagement artifacts with qualified buyers under NDA. Request a copy and we will reply within one business day.

Request artifacts

Related projects

BPO & Contact Centers

Call Center Infrastructure Deployment for Sky CX

End-to-end call center infrastructure — servers, enterprise network switching, call center manager platform, full configuration, and ongoing services.

Read case study

Real Estate & Design Consultancy

HQ Renovation, Data Center, and Security Infrastructure for Pinnacle Misr

End-to-end advisory and delivery — design authority, detailed BoQ, vendor selection, ICT renovation, CCTV, access control, and a turnkey data center — for a leading Egyptian real estate and design consultancy.

Read case study

Plan your next project with Nash.

Tell us what you're scoping. A senior integrator will respond within one business day.